Build

The build

With up to 90% of the Cygnus home manufactured off site, you can expect one of our homes to be ordered and built within as little as 10 weeks!

Icon Build Cream

This attractive 10-week build stage saves on time, cost and minimises the environmental footprint of development.

By using an award winning design team, the best available products and technologies from trusted suppliers, we are able to deliver a home that is resilient, meets the future needs of the planet and is cost effective for the homeowner.

The central core

The whole design concept is based around a central unit, known as the E-Riser Module. This flows through the entire height of the home and hosts the main services and equipment.

The E-Riser Module is manufactured off-site and reduces any logistical complexities of sourcing trades people during the short 10-week installation period. All that is needed is for the utility services to be installed to the connection points already provided.

E Riser
House Foundations Healthy living costs

Innovative partners

We work closely with a selected team of industry leading suppliers. This ensures our manufacturing and design developments are proven, tested and supported.

  • Benchmark
  • British Gypsum
  • Cedral
  • Cygnum
  • Dulux
  • Fakro
  • Flightwise
  • M2
  • Marley Eternit
  • Metrotile
  • Ncube Home
  • Oso
  • Polyflor
  • Polypipe
  • Porcelanosa
  • Proteus
  • Rationel
  • Reliance
  • Renson
  • Rointe
  • Shanco
  • Step On Safety
  • Tamlite
  • Trespa
  • Viessmann
  • Wetherby
  • Wieland